Our Positive aspects:
Substantial quality !———– Reduce the afterwards routine maintenance problems !
Reasonable cost! —- Use price-successful pump, conserve income.
Good provider! ———– Reply Well timed , Sufficient offer, Supply time short
Any questions can go over with us at time. Try out our greatest to assist you. Not only pumps, other goods also can help you locate what you need to have.
LC large viscosity electrical soiled oil rotary lobe pump
Brief introduction:
LC large viscosity electric powered dirty oil rotary lobe pump is widely used in carrying oil and oil products (when deliver the gasoline, the copper pump leaves are needed) and transport various oil and liquid in plant, such as crude oil, paint, lubricant, glass cement, oilbase acid, toothpaste and dilute alkali liquid (soap processing) etc. In food processing fields, it can deliver different liquid, such as bean sauce, barm, thin malt sugar, etc. When load and unload the various tank truck and oiler, it could run forward and backward.
The pump has two driving styles, one is belt drive, the other is gear reducing drive
Capability | ten-150m3/h |
Force | .6mpa |
Energy | four-45kw |
Pace | 1440rpm |
Diameter | fifty-200mm |
Viscosity | one.-300000cst |
Mterial | cast iron,stainless steel |
Max temperature | 200ºC |
Seal | packing seal |
Warranty | one year(normal wear and tear excepted) |
Application scope:
1. Crude oil industry
two. CZPT industry
three. Paint industry
four. Glass glue industry
five. Oil-based acid industry
6. Toothpaste industry
Positive aspects:
one. low rotating rate
2. high efficiency
three. small volume, big flow
4. low consumed power
5. strong self-priming ability
Parameters:
Model | Potential m3/h |
Stress mpa |
Diameter mm |
Suction height m | energy KW |
Speed r/min |
Temperature ≤°C |
bodyweight kg |
Software |
LCX-ten/.six | 10 | .6 | 40 | 6 | 3. | 400 | 140 | 167 | Diesel, Engine Oil, device Oil glycerinum, CZPTeum, Toothpaste, Cooking oil, Viscous Oil |
LCX-18/.six | eighteen | .6 | 50 | six | 5.5 | four hundred | one hundred forty | ||
four. | 140 | 219 | |||||||
LCX-38/.six | 38 | .6 | sixty five | 6 | seven.5 | 400 | a hundred and forty | 269 | |
LCX-fifty/.six | 50 | .six | a hundred | six | 15 | 445 | a hundred and forty | 1160 | |
LCX-eighty/.6 | eighty | .six | 200 | six | 30 | 209 | 140140 | ||
LCQT-100/.6 | one hundred | .6 | 200 | 6 | 37 | 254 | a hundred and forty | ||
LCQT-ten/.6 | 10 | .6 | forty | six | three. | 400 | a hundred and forty | 167 | Gasoline Solvent oil kerosene |
LCQT-18/.6 | eighteen | .six | fifty | six | 5.5 | four hundred | a hundred and forty | 219 | |
4. | a hundred and forty | ||||||||
LCQT-38/.six | 38 | .six | 65 | six | 7.5 | 400 | one hundred forty | 269 | |
LCQT-50/.6 | fifty | .six | a hundred | six | 18.five | 445 | 140 | 1160 | |
LCQT-eighty/.six | 80 | .6 | 200 | 6 | 30 | 209 | a hundred and forty | ||
LCQT-100/.six | one hundred | .six | 200 | six | 37 | 254 | a hundred and forty | ||
LCXW-10/.six | 10 | .six | 40 | six | three. | 400 | 140 | 167 | Pitch/asphalt/biHangZhou Cold oil Viscous oil |
LCXW-18/.6 | 18 | .6 | fifty | 6 | 5.5 | four hundred | 140 | 219 | |
four. | a hundred and forty | ||||||||
LCXW-38/.six | 38 | .six | 65 | six | 7.five | 400 | 169 | ||
LCXW-fifty/.6 | 50 | .6 | one hundred | six | 18.5 | 445 | a hundred and forty | 1160 | |
LCXW-eighty/.sixty | 80 | .six | 200 | 6 | 30 | 209 | one hundred forty | ||
LCXW-a hundred/.six | one hundred | .6 | two hundred | 6 | 37 | 254 | 140 |
FAQ:
1. What is your payment phrases?
Normally 30% TT in advance, we will send out you photos when finish the production, balance 70% should be paid out before supply.
If the total amount is tiny, and shipping time is limited or have inventory, had much better spend a hundred% TT once, it will decrease the process fee and straightforward to operation.
2. What is the supply conditions?
EXW, FOB, CFR, CIF, you could decide on any one which is convenient for you.
3. How about the shipping time?
Generally it requires 7-10 working days after your advance payment get there. The exact delivery time depends on the items and the amount of your buy.
4. Do you examination all the goods prior to supply?
Of training course, we have 100% analyzed just before delivery.
five.Could you source sample?
We are glad to deliver sample for your testing, but the price must be compensated by customers.
6. Can you make in accordance to customer’s sample and drawing?
No issue, it CZPT in accordance to customer’s ask for, we offer OEM provider if quantity is very good.
7.What is the guarantee time?
Our guarantee time is one 12 months generally.
eight. Can we visit your firm?
welcome to come to China and go to our firm, you should kindly inform us prior to your check out, many thanks