Cyyp 74 Uninterrupted Provider Massive Circulation and High Pressure LNG Liquid Oxygen Nitrogen Argon Multiseriate Piston Pump
Solution Description:
1.CZPTtromagnetic velocity adjustment motor/frequency conversion motor/fastened pace motor
2.Overpressure interlocking system Security valve/CZPT verify valve
three.Temperature interlocking system within pump
four. Stress interlocking unit of outlet liquid
That includes:
1.Module style, vast coverage of stream
2.Simple style of pump head areas, practical for routine maintenance
three.Dependable framework of sealing
four.Optional gas auxiliary sealing unit, more enhance the seal daily life
five.Different configurations boost the diploma of basic safety and automation
Application:
1.LO2,LN2,LAr,LNG
two.Fuel provide techniques of large and medium-size steel mill, chemical factory
3.Cylinder filling
4.Tank filling
5.Other medium strain fuel offer system
Optional Configuration:
one.CZPTtromagnetic velocity adjustment motor/frequency conversion motor/set velocity motor
two.Overpressure interlocking device Safety valve/CZPT verify valve
three.Temperature interlocking gadget within pump
4.Strain interlocking unit of outlet liquid
Design | medium | Flow(L/h) | Max outlet pressure(Mpa) | Inlet pressure (Mpa) | Motor Power |
BP20-60/a hundred sixty five | LOX,LIN,LAr | 20-sixty | sixteen.five | .02-.six | 3KW |
BP30-eighty/165 | thirty-eighty | sixteen.5 | .02-.six | 3KW | |
BP60-250/one hundred sixty five | sixty-250 | 16.5 | .02-.six | 5.5KW | |
BP100-three hundred/165 | one hundred-300 | 16.five | .02-.6 | 5.5KW | |
BP100-450/a hundred sixty five | 100-450 | 16.five | .02-.6 | five.5KW | |
BP200-450/165 | two hundred-450 | sixteen.5 | .02-.six | five.5KW | |
BP300-600/a hundred sixty five | three hundred-600 | 16.five | .02-.six | 7.5KW | |
DBP400-900/one hundred sixty five | four hundred-900 | sixteen.5 | .02-.six | eleven KW | |
BP300-700/one hundred sixty five | 300-700 | sixteen.five | .02-.six | seven.5KW | |
BP300-600/thirty | three hundred-600 | three. | .02-.6 | 3KW | |
BP300-900/thirty | three hundred-900 | 3. | .02-.six | 3KW | |
BP600-one thousand/30 | 600-1000 | three. | .02-.6 | 4KW | |
BP600-1200/thirty | 600-1200 | three. | .02-.six | 4KW | |
BP800-1500/thirty | 800-1500 | 3. | .02-.6 | five.5KW | |
DBP1000-3000/thirty | 1000-3000 | three. | .02-.6 | seven.five KW | |
DBP2000-4000/thirty | 2000-4000 | 3. | .02-.6 | eleven KW | |
DBP3000-6000/30 | 3000-6000 | 3. | .02-.six | 15 KW | |
TBP4000-8000/30 | 4000-8000 | three. | .02-.6 | 18.five KW | |
TBP8000-15000/thirty | 8000-15000 | 3. | .02-.6 | 22KW | |
TBP10000-25000/25 | ten thousand-25000 | 2.five | .02-.6 | 37KW | |
TBP10000-25000/30 | 10000-25000 | three. | .02-.6 | 45KW | |
TBP20000-35000/thirty | 20000-35000 | three. | .02-.six | 55 KW | |
TBP30000-45000/thirty | 30000-45000 | 3. | .02-.six | seventy five KW | |
P100-600/100 | CO2 | one hundred-600 | ten. | .02-2.four | five.5KW |
P300-900/a hundred | three hundred-900 | ten. | .02-2.four | 7.5KW | |
P600-1200/one hundred | 600-1200 | ten. | .02-2.4 | 7.5KW | |
P900-1600/a hundred | 900-1600 | 10. | .02-2.4 | 7.5KW | |
BP400/250 | LNG | four hundred | 25. | .02-.6 | seven.5KW |
BP700/250 | 700 | twenty five. | .02-.6 | 11 KW | |
DBP1000/250 | a thousand | 25. | .02-.six | 18.five KW | |
DBP1500/250 | 1500 | twenty five. | .02-.six | 22 KW |
Frequently Questioned Questions:
Q1.What is the shipping time of this pump?
A1.The supply of this gas cylinder is 20 times after the deposit received.
Q2.What payment phrases do you generally use?
A2.We accept TT, 30% as deposit and 70% before shipping.
Q3.What certification do you offer for clients?
A3.We have ASME, CE, DOT,TUV and TPED Certification of our items.
Make contact with:
Tel:-15397130007