Cyyp sixty five Uninterrupted Service Massive Movement and Large Stress LNG Liquid Oxygen Nitrogen Argon Multiseriate Piston Pump
Solution Description:
1.CZPTtromagnetic speed adjustment motor/frequency conversion motor/fastened pace motor
2.Overpressure interlocking unit Safety valve/CZPT check out valve
three.Temperature interlocking device inside of pump
4. Stress interlocking unit of outlet liquid
That includes:
1.Module design, vast coverage of movement
2.Straightforward design and style of pump head areas, practical for servicing
three.Trustworthy framework of sealing
4.Optional gasoline auxiliary sealing unit, even more improve the seal existence
five.Various configurations boost the diploma of safety and automation
Software:
one.LO2,LN2,LAr,LNG
2.Fuel provide programs of huge and medium-dimensions metal mill, chemical manufacturing unit
three.Cylinder filling
four.Tank filling
five.Other medium stress gas supply program
Optional Configuration:
one.CZPTtromagnetic velocity adjustment motor/frequency conversion motor/mounted speed motor
2.Overpressure interlocking gadget Security valve/CZPT check out valve
3.Temperature interlocking gadget inside of pump
4.Strain interlocking device of outlet liquid
Design | medium | Flow(L/h) | Max outlet stress(Mpa) | Inlet strain (Mpa) | Motor Power |
BP20-sixty/a hundred sixty five | LOX,LIN,LAr | twenty-sixty | sixteen.five | .02-.six | 3KW |
BP30-80/one hundred sixty five | thirty-eighty | 16.five | .02-.six | 3KW | |
BP60-250/a hundred sixty five | 60-250 | 16.5 | .02-.6 | 5.5KW | |
BP100-300/a hundred sixty five | a hundred-three hundred | 16.5 | .02-.6 | 5.5KW | |
BP100-450/one hundred sixty five | a hundred-450 | sixteen.5 | .02-.6 | 5.5KW | |
BP200-450/a hundred sixty five | two hundred-450 | 16.5 | .02-.six | 5.5KW | |
BP300-600/one hundred sixty five | three hundred-600 | sixteen.5 | .02-.6 | 7.5KW | |
DBP400-900/a hundred sixty five | four hundred-900 | sixteen.five | .02-.six | 11 KW | |
BP300-seven hundred/165 | three hundred-seven hundred | sixteen.5 | .02-.6 | seven.5KW | |
BP300-600/30 | 300-600 | 3. | .02-.six | 3KW | |
BP300-900/30 | three hundred-900 | three. | .02-.six | 3KW | |
BP600-a thousand/30 | 600-a thousand | three. | .02-.six | 4KW | |
BP600-1200/30 | 600-1200 | three. | .02-.six | 4KW | |
BP800-1500/thirty | 800-1500 | three. | .02-.6 | five.5KW | |
DBP1000-3000/thirty | one thousand-3000 | 3. | .02-.six | 7.5 KW | |
DBP2000-4000/30 | 2000-4000 | three. | .02-.six | 11 KW | |
DBP3000-6000/thirty | 3000-6000 | 3. | .02-.6 | fifteen KW | |
TBP4000-8000/30 | 4000-8000 | three. | .02-.six | eighteen.five KW | |
TBP8000-15000/30 | 8000-15000 | three. | .02-.six | 22KW | |
TBP10000-25000/twenty five | 10000-25000 | 2.five | .02-.six | 37KW | |
TBP10000-25000/thirty | 10000-25000 | three. | .02-.six | 45KW | |
TBP20000-35000/30 | 20000-35000 | 3. | .02-.six | fifty five KW | |
TBP30000-45000/30 | 30000-45000 | 3. | .02-.6 | seventy five KW | |
P100-600/a hundred | CO2 | one hundred-600 | ten. | .02-2.four | five.5KW |
P300-900/100 | 300-900 | 10. | .02-2.4 | seven.5KW | |
P600-1200/a hundred | 600-1200 | ten. | .02-two.4 | 7.5KW | |
P900-1600/a hundred | 900-1600 | 10. | .02-two.four | 7.5KW | |
BP400/250 | LNG | four hundred | 25. | .02-.6 | 7.5KW |
BP700/250 | 700 | twenty five. | .02-.six | 11 KW | |
DBP1000/250 | 1000 | twenty five. | .02-.6 | 18.five KW | |
DBP1500/250 | 1500 | twenty five. | .02-.six | 22 KW |
Frequently Asked Queries:
Q1.What is the supply time of this pump?
A1.The shipping of this gasoline cylinder is twenty days soon after the deposit obtained.
Q2.What payment terms do you generally use?
A2.We settle for TT, 30% as deposit and 70% prior to shipping.
Q3.What certification do you offer for clients?
A3.We have ASME, CE, DOT,TUV and TPED Certification of our products.
Get in touch with:
Tel:-15397130007